The project was a mixture of refurbishment, redevelopment of existing spaces and new build extension split into two phases.

First phase:

Conversion of an unused space with a mezzanine level. This was converted into a new security room and managers office at ground level and kitchenette and locker room on the mezzanine. We installed a Mitsubishi Heat recovery unit to provide a supply and extract system to the ground floor spaces via an insulated ductwork system to ceiling mounted diffusers. Heating and cooling is provided by wall mounted Mitsubishi AC units in each space with local control and fault & enable to existing BMS.

The kitchenette was provided with a sink with an unvented under counter Heatrae Sadia Hotflo 10 litre water heater supplied from an existing CWS.

Second Phase:

This was a refurbishment of an existing Post Room and the incorporation of the old security office to create a larger space. An extension was built on the outside wall to further increase the Post Room floor space. Both the existing space and the extension were fitted with a Mitsubishi Heat recovery unit. These units distribute supply and extract fresh air via an insulated ductwork system to ceiling mounted diffusers. Heating and cooling is provided by four Mitsubishi ceiling mounted cassette units two in each space. These have local control and fault & enable to existing BMS.