- Client: Opto Living
- Principal Contractor: Opto Property Group
- M&E Consultant: Progressive Services Design Ltd
- Architect: Keith Davidson Partnership
- Quantity Surveyor: W.T. Partnership
- Programme: 36 weeks
- Value: £800K

Norstead were appointed to supply, install, test and commission all of the required major plant requirements associated with the mechanical & electrical services. The aim was to achieve a building that is 80% more energy efficient than the current building standard requirements, with a BREEAM rating of outstanding.
The installation works included:
• LTHW heating system
• New packaged chiller serving chilled water system
• Domestic and above ground services, including rainwater harvesting
• Indirect evaporative cooling systems
• Generator, transformer and HV LV distribution
• General small power & lighting distribution
• Static inverter & emergency lighting
• Flexible bus bar systems
• Fire alarms
- Client: Opto Living
- Principal Contractor: Opto Property Group
- M&E Consultant: Progressive Services Design Ltd
- Architect: Keith Davidson Partnership
- Quantity Surveyor: W.T. Partnership
- Programme: 36 weeks
- Value: £800K