- Client: Colt Telecom
- Consultant: Cudd Bentley
- Duration: 12 weeks
- Value: £4.2m

Norstead were employed by Colt Telecom as Main Contractor responsible for the full design and installation of the following activities, working with Cudd Bentley to design the following works:
Electrical
- 6000A switchboards
- 2 x 4 MVA transformers
- 2 x 2 MVA generators c/w acoustic enclosure
- Mains power PLC monitoring
- Switching system
- Fire alarms system
- Vesda system
- FM200 Suppression System
- Lighting
- Emergency Lighting
- BMS System
- Lightning Protection
- AC Power System
- Domestic Services
- Drainage System
- AC System
Building / Civils
- Roof steelworks
- Internal & external piling
- Steelworks to new buildings
- Brickwork for new buildings
- Blockwork to existing buildings
- All decorations/joinery
- Raised floors
- Bomb blast windows
- Piling
- Groundworks/concrete rafts for new external buildings
- Client: Colt Telecom
- Consultant: Cudd Bentley
- Duration: 12 weeks
- Value: £4.2m