Epsom Downs Racecourse

The project incorporated the full mechanical and electrical design and build of the new entrance pavilion complete with ticket hall, offices, race day control room, tote gambling control room, first aid room and male/female race day toilet facilities.

Full mechanical and electrical services were installed including heating, ventilation, climate control, lighting, small power, external lighting, CCTV, fire, intruder and disabled alarm systems.

At specific locations around the site custom made concession supply distribution pillars have been installed complete with RCD protected multiple socket outlets and water connection points to provide all the requirements for the race day entertainment/facilities.

In addition, main supply site wide services have been redesigned and re-routed in preparation for the Phase II Grandstand works including:

  • Mains water supplies
  • Mains gas supplies
  • Course watering and rain water storage system
  • New chilled water pipe work for the grandstand
  • Main high voltage ring main modifications
  • New site distribution main LV switch panel
  • New electrical supply to the Queens building
  • Provision for future electrical chiller and grandstand supplies