- Client: Colt Telecom
- Consultant: Cudd Bentley
- Duration: 20 weeks
- Value: £6.1m

Norstead were appointed by Colt Telecom as Main Contractor responsible for the full design and installation of the following activities, working with the Cudd Bentley to design the following works:
Electrical
Fully automatic PLC controlled power system consisting of:
- 1 x 6300A A&B switchboards
- 2 x 2 MVA generators
- 2 x 4 MVA transformers
- 3200A generator switchboard
- 4 x 625 KVA rotary UPS system
- Fire alarm system
- Vesda early warning system
- FM200 suppression system
- General lighting
- Emergency lighting
- BMS system
- Lightning protection
- AC power system to client racks
Mechanical
- Chilled water system
- Office AC split system
- Drainage systems
- Domestic services
- Insulation
- Fire stopping
- Room units
Building / Civils
- Brickwork / decoration
- Roof cladding
- Structural steel
- Raised floors
- Bomb blast windows
- Partitions / joinery
- Control console / glazing dec.
- Client: Colt Telecom
- Consultant: Cudd Bentley
- Duration: 20 weeks
- Value: £6.1m