John Lewis, Leicester

John Lewis

Project Summary:

A Challenging Mechanical and Electrical services installation to this new build project situated within the newly developed Shires Centre within Leicester town centre.

Timescale:

8 Months

Budget:

£7.5m

A multi phased, four storey building comprising of the following:

  • four sales floor areas
  • Roof top generator installation
  • Eight levels of store room areas
  • Two restaurants
  • Four toilet blocks
  • Office accommodation
  • Two roof top plant areas.
  • John Lewis
  • John Lewis

Services

A fully coordinated services installation was installed into the building including the following systems:

  • Low velocity ductwork comfort cooling/ heating system
  • Air conditioning system
  • Smoke extract systems
  • BMS control systems
  • Domestic services systems
  • General power installations
  • Static inverter / emergency lighting installation
  • Generator
  • Lighting installations
  • Data installation
  • Fire alarm and PA system